RetroFit
When you purchase a retrofit Blended Winglet System from APB, you receive the tools, data, technical support and experience necessary to perform a rapid installation.
We understand that in order to get your return on investment, you need to be flying.
To assure the most efficient Installation possible, APB provides you with:

- Complete Engineering
- All Special Tooling – loaned for the duration of your project
- Full Deck of Installation Task Cards
- On-Site Technical Support to Get Your Installations Up and Running
- 24-7 Engineering Liaison Coverage – via phone and email
- 24-7 AOG Style Parts Support
Installation Task Cards:
Contain a Sequenced Modification Standard or "SMS" that has been optimized over the more than 1000 retrofit installations performed to date.
- Constantly Updated to Reflect:
- Modification Kit Improvements
- Process Flow Improvements Driving Down Turnaround Times
Standard TAT –Turnaround Time – for Stand-alone Installations:
| Model with Description | Estimated Modification Man Hours |
Span Time (Days) |
Best |
| 737-800 Non-Provisioned Wing (Deliveries Prior to L/N 778) |
6 to 8 days 8 days typical |
4 1/2 days | |
| 737-800 Provisioned Wing (Deliveries L/N 778 and On) |
3 to 4 1/2 days 4 days typical |
62 hours– wheels down to wheels up |
|
| 737-700 Non-Provisioned Wing (Deliveries Prior to L/N 1545) |
5 to 7 days 6 days typical |
3 1/2 days | |
| 737-700 Provisioned Wing (Deliveries L/N 1545 and On) |
3 to 4 1/2 days 4 days typical |
3 days | |
| 737-300/500 (125K lbs MTW or Greater) |
1600 hours | 8 to 10 | |
| 737-300/500* (Less than 125K lbs MTW) |
1600 hours | 8 to 10 | |
| 757-200 | 3300 to 3800 | 11 to 15 15 days typical |
8 days |
| * No Load Alleviation System Installed | |||
| Installation times will vary depending on the technical capabilities and experience of the installation crew. |
|||
On-Site Technical Support

- A small team of Technical Managers – representing over 60 years of combined experience in Airline, Manufacturing, Structures, and Planning – who employ the elements of Lean Management and are
PMI-certified Project Management Professionals

- Provide an Orientation Program for Mechanics, Engineering, Quality at All Levels of Leadership
- Liaise with APB Engineering and Supply Chain
- Are available for Consultation on Your Specific Challenge
- Integration with Regular Maintenance Visits or Specialty Visits
- Share “Best Practices” from the more than 40 different Modification Centers (MRO's) they have worked with – and counting...